F&T Engineers for Growth: Creative Materials' Facility Expansion
As Creative Materials, Inc. continues to grow, its Ayer, Massachusetts facility is evolving alongside it. The manufacturer, known for developing and producing specialty adhesives, coatings, and inks, is undertaking a significant renovation and expansion designed to create additional capacity while enhancing the spaces and building systems that support its day-to-day operations.

Working alongside architect Maugel DeStefano Architects, Fitzemeyer & Tocci Associates, Inc. (F&T) is providing mechanical, electrical, plumbing, and fire protection engineering for the project.
At the heart of the expansion is a new approximately 20,000-square-foot warehouse addition, providing Creative Materials with increased storage capacity and two new loading docks to better support its operations. F&T is designing the HVAC, plumbing, electrical, and fire protection systems serving the new space, carefully integrating them with the infrastructure of the existing facility.
The project is well beyond the new addition. Renovations throughout the existing building are creating a more functional and cohesive environment, with improvements to the main entrance, a new side entrance, new and renovated restrooms, upgrades to the employee break room, and new pass-throughs supporting operations.
By bringing the new addition and existing facility together through coordinated architectural and engineering design, the project is creating a facility that is better equipped to meet Creative Materials' needs today while providing the flexibility and capacity to support its continued growth. The construction is underway and the project will be completed in 2027.






Comments