top of page

Case Study on Wakefield Thermal - C/A Design, Inc.'s Manufacturing & Office Facility – New Headquarters

How do you modernize and expand an advanced manufacturing facility while controlling costs, supporting future growth, and minimizing disruptions? That was the challenge facing C/A Design and Wakefield Thermal during the transformation of their Exeter, New Hampshire facility. From avoiding a major electrical service upgrade to designing scalable building systems for future expansion, the project demonstrates how thoughtful engineering can create lasting value.


Page 1 of the case study for the New Headquarters at Wakefield Thermal - C/A Design Inc.

Download the full case study to explore the challenges, solutions, and results behind this successful facility upgrade.



Comments


NAVIGATE

VISIT US

Fitzemeyer & Tocci Associates, Inc
300 Unicorn Park Drive,
5th Floor
Woburn, MA 01801
(781) 481-0210​ | info@f-t.com

STAY CONNECTED

  • facebook
  • youtube
  • linkedin

©2025 by Fitzemeyer & Tocci Associates, Inc. All Rights Reserved. 

bottom of page