Usable Redundancy in Healthcare Design: Building Resiliency into the Brigham & Women's Faulkner Hospital Inpatient Tower
Learning Objectives:
After reading this article, the audience will be able to:
Understand how a double-ended normal power distribution system can improve electrical resiliency while supporting operational flexibility and maintainability in a modern acute-care hospital.
Recognize the value of a redundant chilled water system designed around actual hospital operational needs rather than a traditional blanket 2N approach.
Evaluate how redundant air handling systems support continuous patient care, infection control, and maintenance activities without disrupting hospital operations.
Identify the benefits of paralleled generator systems and understand how "usable redundancy" can provide greater resiliency, efficiency, and long-term value than conventional redundancy strategies.
Discover how energy efficiency can be built into any project through thoughtful design, without sacrificing performance in other areas.

Introduction
Healthcare facilities represent one of the most demanding environments for mechanical, electrical, and plumbing (MEP) system design. Unlike commercial office buildings, educational facilities, or residential developments, hospitals must continue operating regardless of equipment failures, maintenance activities, utility interruptions, severe weather events, or public health emergencies. Every design decision must ultimately support the hospital's ability to safely care for patients.
The design of the Brigham & Women's Faulkner Hospital (BWFH) Inpatient Tower Addition and Renovation presented the engineering team with an opportunity to rethink how resiliency is incorporated into an aged healthcare facility. The project team recognized that traditional approaches to redundancy often focus on achieving a prescribed level of equipment duplication. While redundancy is essential, simply installing duplicate equipment does not necessarily result in a more resilient facility.
A common industry solution is the implementation of a strict 2N design strategy, where every critical component is completely duplicated. Although this approach can provide resiliency and reliability, it frequently results in increased capital costs, larger physical infrastructure requirements, greater maintenance burdens, and equipment that may rarely operate under normal conditions.
For BWFH, the project team instead focused on a philosophy best described as usable redundancy. Rather than designing for equipment duplication alone, systems were carefully evaluated based on how the hospital would actually use them during normal operations, maintenance events, equipment failures, emergency conditions, and future expansion.
This approach asked a series of important questions:
What level of service must remain available during maintenance?
What equipment failures are most likely to occur?
How can systems remain fully functional while components are removed from service?
How can additional resiliency be achieved without unnecessary equipment duplication?
How can infrastructure support future healthcare delivery needs?
The answers led to incorporating several resiliency strategies, including:
Double-ended normal electrical distribution.
Redundant chilled water infrastructure.
Redundant air handling systems and exhaust systems.
Paralleled emergency generator systems.
Together, these systems provide resiliency that can be actively utilized rather than simply sitting idle waiting for a catastrophic failure.
Healthcare resiliency extends beyond keeping lights on during a utility outage. True resiliency means maintaining clinical operations, preserving patient comfort, protecting infection control requirements, supporting imaging systems, enabling maintenance activities, and providing flexibility to respond to future healthcare challenges. The BWFH Inpatient Tower demonstrates how resiliency can become an operational asset rather than simply an insurance policy.
The Challenge: Designing for Continuous Hospital Operations

Hospitals play a critical part in public safety and care and because of this, they never close.
Unlike most building types, healthcare facilities operate twenty-four hours per day, seven days per week, 365 days per year. Patients occupy inpatient rooms continuously, operating rooms perform critical procedures, imaging equipment supports diagnosis and treatment decisions, and support spaces remain active around the clock.
For the BWFH Inpatient Tower, resiliency requirements extended well beyond code minimum compliance. While healthcare codes and standards establish important reliability requirements, the hospital sought infrastructure capable of providing operational continuity even during situations such as:
Planned maintenance outages.
Equipment replacement projects.
Utility disturbances.
Mechanical equipment failures.
Future facility expansion and/or renovation.
Public health emergencies.
Extreme weather events.
The challenge was not simply providing backup equipment. The challenge was determining how that equipment should be configured to maximize operational benefits while remaining financially responsible. Traditional redundancy strategies often result in equipment that remains largely unused until an emergency occurs. While this may satisfy a reliability objective on paper, it can create several drawbacks:
Increased first cost.
Additional space requirements.
More equipment requiring maintenance.
Reduced operating efficiency.
Underutilized infrastructure.
The design team therefore pursued resiliency strategies that could provide meaningful operational value every day while still delivering the reliability expected from a major healthcare institution.
The resulting concept centered on usable redundancy.
Rather than asking "How do we duplicate every system?" the team instead asked:
"How do we ensure the hospital can continue functioning under realistic operating conditions?"
This subtle but important shift in design philosophy drove many of the project's most successful resiliency features.
Double-Ended Normal Power: Electrical Resiliency Beyond Minimum Code Requirements

Electrical distribution forms the backbone of every modern hospital. Virtually every clinical department depends on reliable power to support patient care, life safety systems, communications, medical equipment, and building operations.
In a conventional radial electrical system, a main switchboard is typically supplied from a single source. While this arrangement is straightforward, maintenance activities or equipment failures can significantly impact downstream loads. A double-ended configuration fundamentally changes this relationship. Two utility-fed electrical distribution sections are interconnected through bus tie arrangements and selective distribution pathways. This configuration creates multiple available power paths capable of supporting critical building functions. The advantages extend far beyond utility outage scenarios.
For the BWFH Inpatient Tower, a double-ended normal power distribution strategy was selected to enhance operational flexibility and reliability. This design mirrored the functionality of the existing hospital electrical system and utilized the existing medium voltage switchgear to extend the two utility services currently serving the facility.
Maintenance Without Service Interruption
Hospitals routinely require maintenance on switchgear, transformers, protective devices, and downstream distribution equipment. In a traditional arrangement, maintenance may require scheduled shutdowns, temporary generators, temporary power distribution, after-hours work, or operational restrictions. With a double-ended architecture, loads can often be transferred to alternate sections while maintenance is performed.
This capability produces several benefits:
Reduced operational risk.
Simplified maintenance planning.
Lower outage exposure.
Greater flexibility for future modifications
Most importantly, patient care activities experience fewer disruptions.
Increased System Reliability
Equipment failures rarely occur at convenient times. A transformer failure, protective device malfunction, or cable issue can significantly impact a hospital if only a single distribution path exists. Double-ended systems create alternate electrical pathways that improve resilience against failures of an incoming primary feeder or main switchboard circuit breaker. By opening or closing a tie breaker, maintenance can be performed where it is needed, without needing a full building shut down. This helps to minimize the downtime experienced by the facility’s staff, ideally allowing any disruption to go unnoticed.
Future Adaptability
Healthcare facilities continuously evolve. Departments expand, technologies change, and electrical demand profiles shift throughout the life of a facility. A double-ended electrical distribution system provides flexibility to accommodate future growth while maintaining high reliability. This adaptability becomes especially valuable in large campus environments where future renovation projects are inevitable.
For BWFH, the double-ended switchgear helps limit the impact of shutdowns. Half of the building system can remain untouched and operational while the other half is offline to allow for tie-ins to occur. While never simple, this helps make it easier for the facilities staff to plan these shutdowns and minimally affect the patients being served.
Redundant Chilled Water Systems: Supporting Critical Healthcare Functions

Among the project's resiliency themes was the incorporation of a redundant chilled water system to support the imaging equipment; multiple MRI's and CT modalities.
Chilled water systems are frequently viewed primarily as comfort cooling infrastructure. In healthcare facilities, however, chilled water often supports far more than occupant comfort.
Critical healthcare applications can include:
Diagnostic imaging equipment.
Procedure spaces.
Data centers.
Pharmacy environments.
Equipment rooms.
Specialized treatment spaces.
Failure of chilled water service can have operational impacts that reach well beyond thermal comfort concerns. If the inpatient chiller plant was to require maintenance or experience a failure and not keep up with cooing demand it could potentially impact the MRI equipment and thus the procedure in progress.
By including a side-stream air-cooled chiller in the design, to support the imaging suite equipment, another level of reliability and resiliency is added to the building. This also improves overall energy usage. By normally serving the MRI and CT imaging equipment from the central chilled water plant consisting of high efficiency mag-lev chillers, the chilled water system can modulate to the necessary load. When the imaging equipment is in standby mode or not in use, the main chiller plant can ramp down, decreasing compressor and energy use. The central plant system was optimized to exceed typical efficiency requirements and receive utility incentives for increase efficiency.
The Limitations of Traditional Redundancy
A conventional 2N approach might simply duplicate every chiller, pump, heat exchanger, or distribution component.
While reliable, this strategy can produce excess infrastructure that may rarely be utilized while creating substantial first-cost impacts.
The BWFH design philosophy instead focused on understanding actual operational requirements.
Questions included:
Which loads are truly critical?
How much cooling must remain available during equipment outages?
What maintenance scenarios are most likely?
How can cooling be preserved during equipment replacement?
What future demand increases may occur?
Answering these questions enables infrastructure to be right-sized for real-world conditions.
Usable Redundancy in Practice
A resilient chilled water design should allow equipment to be removed from service while maintaining required cooling performance.
The objective is not necessarily maintaining 100% peak design capacity during every possible event but, instead, the objective is to preserve hospital operations.
For example:
Imaging equipment remains operational.
Critical departments remain conditioned.
Patient comfort is preserved.
Maintenance activities can proceed safely.
This distinction is important.
Maintaining 100% theoretical capacity under every conceivable operating condition may not represent the best use of project resources.
Maintaining the cooling capacity actually needed for continued clinical operation often provides greater value.
Improved Reliability for Patient Care

Healthcare environments increasingly rely on sophisticated diagnostic technologies.
MRI systems, imaging suites, and supporting technologies represent major capital investments whose performance depends upon stable environmental conditions.
A resilient chilled water system helps protect these investments while ensuring patient services remain available.
Through thoughtful system architecture rather than simple duplication, the BWFH project demonstrates how cooling infrastructure can remain reliable, maintainable, and adaptable.
Redundant Air-Handling Systems: Resiliency Through Flexibility
Hospitals cannot simply shut down patient-care areas every time a major piece of HVAC equipment requires maintenance. They also cannot predict when changing clinical conditions will require rooms or entire floors to operate differently than originally planned.
That is why resiliency in healthcare HVAC design is about more than having backup equipment. It is about giving the hospital options.
For the Brigham & Women’s Faulkner Hospital Inpatient Tower, the air-handling strategy was developed around that idea. Redundant air-handling capacity supports reliable day-to-day operation, while additional system flexibility allows the hospital to respond to maintenance, changing operating conditions, and increased infection-control needs.
Making Redundancy Useful
Traditional redundancy is easy to understand: if one piece of equipment fails, another is available to take its place.
That provides reliability, but it does not necessarily provide flexibility. A better approach is to make the redundant capacity useful during normal, or abnormal, hospital operation as well.
This is the idea behind “usable redundancy.”
Rather than having backup capacity that exists only for an emergency, the system is arranged so the available capacity can help the hospital operate, maintain equipment, and respond when conditions change.
The difference is important. A hospital does not benefit simply from owning more equipment. It benefits from having more ways to keep the building operating when something changes.
Maintaining the Equipment Without Disrupting the Hospital
Air-handling equipment requires maintenance throughout its life. Filters need to be replaced. Coils need to be cleaned. Fans and motors need service. Sensors require calibration, and controls eventually need repair or upgrades.
In many buildings, the solution is simple: shut down the system, complete the work, and turn it back on.
This is not easily accomplished in hospitals.
Patient-care areas may operate around the clock. Depending on the area served, shutting down an air-handling system can affect more than temperature and comfort. Ventilation, humidity, and pressure relationships may also be affected. That can make even routine maintenance difficult to coordinate and complete effectively.
Redundant air-handling capacity gives the hospital more choices.
Instead of allowing maintenance requirements to dictate whether an area can remain operational, the HVAC system provides greater flexibility to coordinate equipment maintenance around hospital operations.
That makes redundancy valuable during the ordinary life of the building, not just when equipment fails.
By interconnecting air handling system duct systems with isolation dampers and implementing controls, the main air handling systems can be isolated for service while the other air handlers can remain in service and maintain patient comfort, ventilation requirements and space pressurization needs.
Detailed view of rooftop mechanical systems, including insulated piping and large-scale ductwork. Rooftop mechanical systems with interconnected ductwork and ventilation components. Exterior view of mechanical equipment and piping infrastructure serving the hospital.
Preparing for Different Clinical Needs
The same principle applies when patient care needs change.
The COVID-19 pandemic demonstrated how quickly hospitals can face new demands for airborne-precaution space. A hospital may have a certain number of rooms dedicated to that purpose under normal conditions, but a sudden increase in demand can quickly change what is needed.
The fifth floor of the Faulkner Hospital Inpatient Tower was designed with this possibility in mind.
Under normal conditions, the patient rooms can operate as standard patient rooms. When additional airborne-precaution capacity is needed, the floor can be transitioned into an alternate operating mode.
In that mode, air supplied to the patient rooms is exhausted directly outdoors, and the rooms operate with negative, once-through airflow. The building management system and movable partitions support this conversion.
The concept is straightforward: use the space normally when conditions are normal but provide a way for the hospital to operate it differently when conditions or patient demand change.
The hospital does not need to predict when that capability will be needed. The infrastructure is already there.
Designing for the Alternate Condition
Providing an alternate operating mode takes more than changing a control setting.
The HVAC system also has to be capable of operating under the more demanding condition.
For the fifth floor, the exhaust fans and associated ductwork were designed for the higher pressure losses associated with the increased airflow required during the alternate mode. The air-handling equipment was also provided with greater capacity heating and cooling coils so the system could maintain appropriate supply-air temperatures during peak outdoor conditions while operating with 100 percent outdoor air.
In simple terms, the system was not only given a different mode of operation. The equipment was sized so that mode would operate as intended when needed.
That distinction matters.
A flexible operating sequence has limited value if the fans, coils, ductwork, or controls cannot support the alternate condition.
Providing the Concept
The alternate operating mode was also tested and commissioned at the end of construction.
The design team worked with the general contractor, commissioning agent, controls contractor, and testing-and-balancing contractor to operate the system through its changeover sequence, confirm the intended airflows, and verify that the patient rooms remained negatively pressurized in airborne-precaution mode.
That testing turns an idea on paper into an operating strategy the hospital can use.
This is an important part of resiliency. It is not enough to show an alternate operating mode on the drawings or describe it in a control sequence. The hospital needs confidence that the building can actually operate the way it is intended to operate.
Flexibility Without the Everyday Energy Penalty
The fifth-floor strategy also avoids another potential problem: operating the hospital continuously in its most demanding condition.
The patient rooms do not need to operate as airborne-precaution rooms every day. Under normal conditions, they remain as standard patient rooms.
When additional airborne-precaution capacity is needed, the hospital can shift the floor into the alternate mode.
That means the additional exhaust and outdoor-air conditioning required for that mode are used when they are needed rather than continuously.
The design also includes the ability for the fifth floor to be divided into two zones. The hospital has the capability to activate the negative pressure control system for half the patient floor while the other half of the patient rooms remain in normal operation. This adds even more flexibility and helps to conserve energy when there is a condition where a minimal amount of airborne precaution rooms are needed.
The hospital therefore gains additional capability without making the most energy-intensive condition the normal operating condition.
It is a practical balance between preparedness and everyday operation.
Resiliency Through Choice
The larger lesson is simple.
Resiliency is not just about how much backup equipment a hospital has. It is about how many options the hospital has when something changes.
At Faulkner Hospital, redundant air-handling capacity provides flexibility when equipment needs maintenance or is unavailable. The fifth-floor strategy takes the same idea a step further by allowing standard patient rooms to support a different clinical need when necessary.
One strategy helps the hospital respond to equipment needs. The other helps it respond to patient-care needs.
Both accomplish the same larger goal: keeping the hospital operational when conditions do not go according to plan.
No design can anticipate every challenge a hospital will face over the life of a building. But the infrastructure can be designed so the hospital has more than one way to respond to multiple scenarios.
That is the real value of usable redundancy: not equipment sitting in reserve, but infrastructure that gives the hospital choices.
Paralleled Generators: Creating a More Resilient Emergency Power System
Emergency power generation remains one of the most important resiliency systems in any hospital. When utility service is interrupted, generators become responsible for supporting:
Life safety systems.
Critical care operations.
Medical equipment.
Communications infrastructure.
Building systems.
Support services.
Traditionally, emergency generation may consist of one or two very large generators. While effective, these configurations can create operational challenges. The BWFH project instead employed a resiliency strategy centered on paralleled generation sized around utilizing both generators for standard operation.
What Makes Paralleled Generation Different?
Rather than relying on a single large machine, paralleled systems distribute emergency load among multiple generators operating together. This approach creates several resiliency advantages. If one generator becomes unavailable, the remaining generators continue operating. Maintenance activities can often occur without complete system shutdown. Capacity can be matched more efficiently to actual building demand. Most importantly, emergency power availability becomes less dependent on a single piece of equipment.
For BWFH, each generator in the system was sized to the life safety and critical systems. If either generator was lost, the other would be able to keep those systems up and running to allow for maintenance to be performed. This also alleviated the need for a temporary generator connection for maintenance purposes. If the building operates at a lower load than designed, it also allows for one generator to remain offline until needed.
The Practical Benefits of Usable Redundancy
Paralleled generation embodies the concept of usable redundancy. Instead of maintaining a fully idle duplicate generator that rarely operates, multiple generators actively participate in supporting the facility.
Benefits include:
Improved load management.
Increased operational flexibility.
Better maintenance capabilities.
Reduced single points of failure.
The result is infrastructure that contributes value throughout its lifecycle.
Energy Efficiency Through Usable Redundancy
Resiliency and energy efficiency are often treated as competing goals. Duplicate equipment that sits idle, systems sized for worst-case conditions that rarely occur, and infrastructure that runs in its most demanding mode all tend to increase a building's energy use. In a hospital that operates twenty-four hours a day, those penalties accumulate every hour of every year.
The BWFH Inpatient Tower took a different approach. Because usable redundancy asks how systems will actually be used, many of the same decisions that improved resiliency also reduced unnecessary energy use.
Rooftop cooling equipment installed on an elevated structural support system. Rooftop air-handling equipment featuring a large metal enclosure and integrated ventilation louvers. Marley rooftop cooling equipment installed on an elevated structural support system.
Free Cooling Operations
A typical energy saving technique is using economizer mode on air handling systems when the outdoor air temperature and humidity are favorable to maintain space temperature and occupant comfort.
In addition to air-side economizer mode the cooling towers for the chilled water systems have been implanted to provide free cooling by circulating the condenser water through the towers and heat exchanger which cools the primary chilled water loop. This allows the chilled water system to be cooled by ambient cold temperatures avoiding the need to run the mechanical cooling system. This provides free cooling when economizer mode can’t achieve the required supply air temperatures but keeps the mechanical cooling portion of the chilled water plant offline saving energy.
Chilled beams offer another way to reduce energy use due to the warmer water temperatures needed for cooling. The warmer water temperatures are necessary to avoid condensation on the face of the beams, but this also allows for the chilled water system to operate more efficiently.
Efficiency as a Product of Good Design Decision
Across the project, energy efficiency was not a separate layer added on top of the resiliency strategy. It came from the same design questions:
Which capabilities does the hospital need every day, and which only occasionally?
Can a system be sized for the loads that matter most rather than duplicated in full?
Can capacity be brought online as demand requires instead of running continuously?
Can part of a system operate in its most demanding mode while the rest stays in normal operation?
Can the air handling systems take advantage of economizer and free cooling?
Can ventilation air be separated from space cooling so the building moves less air?
By answering those questions with actual operating conditions in mind, the design team delivered systems that are ready for the hospital's most demanding scenarios without making those scenarios the everyday condition. The hospital gains resiliency and flexibility without paying a continuous energy penalty for them.
The Broader Value of Usable Redundancy
The most important lesson from the BWFH Inpatient Tower project is that resiliency and redundancy are not necessarily synonymous.
A resilient system is not simply the system with the most equipment. A resilient system is the one that continues supporting patient care when challenged.
Usable redundancy recognizes that reliability is achieved through thoughtful engineering decisions rather than indiscriminate duplication.
Key characteristics include:
System flexibility.
Operational adaptability.
Maintainability.
Strategic capacity planning.
Reduction of single points of failure.
Support for future growth.
When applied effectively, usable redundancy can produce systems that are simultaneously:
More resilient.
More efficient.
More flexible.
More cost-effective.
This design philosophy aligns infrastructure investments with actual operational needs rather than theoretical worst-case scenarios.
Conclusion
The Brigham & Women's Faulkner Hospital Inpatient Tower Addition and Renovation represents a strong example of modern healthcare resiliency design. Rather than relying solely on traditional 2N duplication strategies, the project leveraged a philosophy of usable redundancy to create infrastructure capable of supporting operational continuity while remaining adaptable, maintainable, and efficient. The project's resiliency tactics specifically included double-ended normal power, redundant air handling systems, MRI chilled water resiliency, and usable redundancy as core design drivers.
With double-ended electrical distribution, the hospital gains operational flexibility and improved maintainability. With redundant chilled water infrastructure, critical cooling functions remain available during maintenance and equipment failures. With redundant air handling systems, environmental control and infection prevention objectives can continue to be met even during challenging operating conditions. With paralleled generator systems, emergency power resiliency is enhanced while supporting operational efficiency and future expansion.
Most importantly, the project demonstrates that resiliency should be evaluated through the lens of hospital operations. The ultimate objective is not simply to provide duplicate equipment. The objective is to ensure that patients continue receiving care, clinicians can perform their work, and the facility can adapt to both planned and unplanned events.
As healthcare facilities continue to face increasing operational demands, aging infrastructure, workforce challenges, climate-related risks, and evolving patient care models, the concept of usable redundancy offers a valuable framework for the design of new infrastructure. The BWFH Inpatient Tower illustrates how engineering teams can move beyond traditional redundancy metrics and instead deliver infrastructure that is actively useful, operationally resilient, and aligned with the long-term mission of healthcare delivery.